SiteVue tracks each pour, lift and install on your data center build, crew by crew and zone by zone. Proven to boost OEE and site efficiency by 10–20%, recover 5–10% of labor hours, and detect over 90% of near misses.
+3% profit margin growth in 3 months.
A scroll-driven 3D tour of the site work. Hard-hat and station cameras follow the carpenters, the concrete crew and the lift crew.
Hard Hat, Uniform and Station cameras follow the carpenters, the concrete crew and the lift crew as they build a data center.
First-person video of a slab pour and rebar cutting. SiteVue logs how much of each bay is placed, flags bare hands at the grinder, and keeps each clip with the day's record.
Trace a pad, a lift or an install to the date, crew and step, with video of each step, to answer owner and inspector questions and support change orders.
SiteVue installs in days, with no software integration required, and runs independently of your IT systems. Cameras move with the work as the job goes from site work to fit-out.
No. SiteVue provides all hardware and software and needs one internet location.
Yes. Managers are trained on the SiteVue dashboard in under an hour.
Station, hard hat, uniform and safety glasses cameras, mixed by trade and area.
Yes. They can make SiteVue cameras a condition of site access, so each contractor and vendor is measured against the same standards.
Yes. SiteVue cameras are built for active job sites. During the site visit, our team confirms the right camera and mounting for each area, including dust, heat and weather.
Yes. No audio is captured, video is processed in a closed system, and worker footage is used for operational metrics only. Footage can be blurred.
A monthly subscription per camera, covering equipment and AI model training, plus a one-time setup fee per camera. Annual billing; you can cancel anytime.
Discover what SiteVue can do for your build, with numbers specific to your site, crews, and schedule.